· Phase 03

Installation & Commissioning

Installation is done with precision. We integrate the water and lighting systems into the space and close with commissioning.

W Algarve

Precise installation

We carry out the installation on site, with precision. The system enters the existing space without losing the reading of the architecture.

W Algarve — 18
W Algarve

Water and lighting

We integrate the water and lighting systems as one. Light and water become part of the same design, in the same place.

Monumento ao Empresário — 1
W Algarve

Commissioning and handover

Commissioning puts water, light and control to work together: filling, programming and scene testing. The system is integrated into the space, not merely installed.

On site

A project

W Algarve

W Algarve by Marriott, Albufeira

Installation and commissioning in an operating hotel, with a water and light show.

TURN YOUR IDEA INTO REALITY

WE ARE READY TO HELP YOU!